Innovative solutions for optimizing costs, space, and efficiency

Advanced Battery Testing Solutions

Discover our innovative solutions that address the key pain points in the new energy industry, optimizing costs, space, and efficiency.

SINEXCEL-Re Solutions

Distributed Solutions

Pain Points:

The capacity expansion and increased testing in new energy enterprises lead to higher costs associated with testing equipment and facility expansion:

  • Infrastructure Costs: civil construction area costs, water/electricity/gas construction costs, costs of other necessary facilities
  • Equipment Costs: battery testing system costs, temperature chamber equipment costs, air conditioning/water cooling tower costs
  • Management Costs: complex technical integration of various types of equipment, requiring significant effort; difficulties in unifying equipment protocols and informatization construction; coordination challenges for equipment commissioning/operation and maintenance, leading to inefficiencies

Value:

The new generation distributed solution employs a dual-bus energy circulation system, reducing the ratio of AC power modules and integrating temperature chambers to shorten the wiring harness, providing a low-cost, high-efficiency, energy-saving, environmentally friendly, and neat battery testing line for battery testing laboratories:

  • System (module and wiring harness) cost reduction by 25%
  • Floor space saving by 20%
  • Energy savings of 30%

All-in-one Programme

Pain Points:

The traditional standalone charging and discharging equipment and temperature chamber configurations have the following drawbacks:

  • The two types of equipment operate independently, resulting in low space utilization;
  • Long cable runs lead to high material costs and significant heat loss;
  • Exposed testing harnesses are of varying lengths, resulting in a tangled and unsightly appearance.

Value:

  • Saves floor space and increases space utilization;
  • Reduces equipment and facility infrastructure investment costs;
  • Testing harnesses are routed inside the temperature chamber, ensuring a neat and tidy appearance;
  • Saves time on linkage configuration and provides integrated monitoring.

Central Control Cabinet/Integrated Test Bench

Pain Points:

To comprehensively evaluate the performance of battery modules and packs, a series of instruments must be used for multi-dimensional testing to ensure safety and reliability. However, the complex interfacing with multiple types of peripheral protocols makes data management challenging.

Value:

  • Supports coordinated operation with peripheral devices through the central controller, enabling offline operation and ensuring data security without loss.
  • Facilitates integrated operation, unified monitoring, and data synchronization for accurate, rapid, and multi-faceted evaluation of battery performance.

Comparison Table

Feature Distributed Solutions All-in-one Programme Central Control Cabinet
Cost Reduction 25% 15% 20%
Space Saving 20% 25% 30%
Energy Savings 30% 35% 40%

Key Benefits

Increase Efficiency
Optimize Space
Enhance Monitor

Cost Saving

Find Your Series

Ready to transform your battery testing processes?

Let’s build the future with innovation.

Please provide the following details to help our sales represent atives better understand your needs and get in touch with you as soon.

Africa

Tel : +86 020 31239309/37413516
Address:Building 2, No. 34, Xialiang Shakenghe Road, Baiyun District, Guangzhou, China